As the lead mechanical engineer with Beaudin Ganze, Mark Schlosser was responsible for HVAC and plumbing design, LEED calculations, and energy savings for this 10,000sf LEED Gold building in Truckee, CA.
Completed in 2010, the building includes custom air handlers, underfloor air distribution, evaporative cooling, electro-pulse water treatment, daylighting controls, and 9 out of 10 LEED Energy points.