North Tahoe Fire Protection District’s new emergency operations center and fire station. As the lead mechanical engineer and MEP project manager, Mark Schlosser was responsible for HVAC and plumbing design, LEED calculations, and energy savings for this 22,000sf LEED Gold building in Tahoe City, CA.
The station includes wood construction, variable air handler, evaporative cooling, economizers, vehicle exhaust extraction, apparatus bay ventilation, compressed air systems, alarm systems, snow melting, high-efficiency boilers, solar thermal collectors, solar photovoltaic collectors, hydronic heated floors, electro-pulse water treatment and well-coordinated design.